RUI-WA project description
RUI-WA
Summary
This project, led by Ulrickson, Hoffmaster, used the ISS in the Upper Spokane Valley, ID from April thru July, 1996. EOL does not possess a description of this project. If you have a description, please contact EOL at the email address below.
Data access
Search for datasets
Temporal coverage
Begin date: 1996-04-01 00:00:00, End date: 1996-08-01 23:59:59Spatial coverage
Minimum latitude: -90.000000, Minimum longitude: -180.000000Maximum latitude: 90.000000, Maximum longitude: 180.000000