GCIP/GIST: GCIP Integrated Systems Test
Summary
The Global Energy and Water Cycle Experiment (GEWEX) Continental-scale International Project (GCIP) Integrated Systems Test (GIST) takes place in the Arkansas-Red River basins as a data system test prior to the start of the 5 year GCIP Enhanced Observing Period (1995-2000). The Arkansas and Red River basins provide a number of watershed areas that are potentionally useful for hydrologic focussed studies. The GIST Data Set constitutes the third in a series of GCIP Initial Data Sets (GIDS-3).
Objectives:
The primary objectives for GIST are: (1) to demonstrate to the satisfaction of the scientific community, the adequacy of a GCIP data collection and management system for an initial set of diagnostic, evaluation, and modeling studies; and (2) to rectify any data system modifications identified in time for providing the services needed during the Enhanced Observing Period.
Data access
Additional information
GCMD Name | G - I > GCIP > GEWEX Continental-Scale International Project > 70ea1650-902a-4022-8103-3c7a1fb3bc44 |
Related links |
|
Temporal coverage
Begin Date | 1994-04-01 00:00:00 |
End Date | 1994-08-31 23:59:59 |
Spatial coverage
Map data from IBCSO, IBCAO, and Global Topography.
Maximum (North) Latitude:
40.00,
Minimum (South) Latitude:
31.00
Minimum (West) Longitude:
-107.00,
Maximum (East) Longitude:
-91.00
Related projects
Parent project | GCIP: GEWEX Continental-scale International Projects |