Dataset List
Dataset | Projects | Responsible parties | Version/ |
---|---|---|---|
|
final
1.0
2011-09-14 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2005-09-13 |
||
|
final
1.0
2008-09-26 |
||
|
final
1.0
2016-04-11 |
||
|
final
1.0
2022-12-23 |
||
|
final
1.0
2016-04-27 |
||
|
final
1.0
2014-08-19 |
||
|
preliminary
completed
|
||
|
final
1.0
2020-06-11 |
||
|
final
1.0
2020-07-15 |
||
|
final
1.0
2022-10-18 |
||
|
final
2.0
2021-01-20 |
||
|
final
2.0
2021-01-21 |
||
|
final
2.0
2021-04-28 |
||
|
final
1.0
2020-05-28 |
||
|
final
1.0
2022-11-18 |
||
|
final
1.0
2022-11-18 |
||
|
final
1.0
2022-11-21 |
||
|
final
1.0
2022-11-21 |
||
|
final
1.0
2023-05-05 |
||
|
final
1.0
2020-04-21 |
||
|
final
1.0
2017-02-24 |
||
|
final
1.0
2017-03-08 |
||
|
final
1.0
2017-04-05 |
||
|
final
1.0
2017-03-17 |
||
|
final
2.1
2021-03-01 |
||
|
final
2.1
2021-03-01 |
||
|
final
1.0
2016-06-23 |
||
|
final
2.0
2015-09-21 |
||
|
final
1.0
2017-03-03 |
||
|
final
1.0
2017-03-03 |
||
|
final
1.0
2021-09-30 |
||
|
final
1.0
2010-07-15 |
||
|
final
completed
|
||
|
final
1.0
2008-10-07 |
||
|
final
1.0
2011-05-17 |
||
|
preliminary
completed
|
||
A link to the NCAR/EOL TREX ISFS plots website.
|
|
preliminary
completed
|
|
|
preliminary
completed
|
||
|
final
1.0
2016-02-18 |
||
|
final
1.0
2016-02-17 |
||
|
final
1.0
2016-02-18 |
||
|
final
1.0
2016-02-08 |
||
|
final
1.2
2023-11-03 |
||
|
final
3.2
2023-11-03 |
||
|
final
3.2
2023-11-03 |
||
|
final
2.1
2023-11-03 |
||
|
final
3.1
2023-11-03 |
||
|
final
3.1
2023-11-03 |
||
|
final
3.2
2023-11-03 |
||
|
final
1.0
2011-07-22 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
2.0
2016-08-25 |
||
|
final
2.1
2017-04-11 |
||
This dataset includes low rate navigation, state parameter, and microphysics flight-level data collected by the NCAR GV during HIPPO-2. The data are in NASA Ames format. The up to date entry for the HIPPO-2 Low Rate Navigation, State Parameter, and...
|
|
final
1.0
2012-11-18 |
|
|
final
4.0
2016-11-11 |
||
|
final
5.0
2017-03-24 |
||
|
final
5.0
2017-03-24 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
preliminary
completed
|
||
|
final
1.0
2022-01-06 |
||
|
final
1.0
2022-01-06 |
||
|
final
1.0
2001-09-26 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-12-20 |
||
|
final
1.0
2011-11-23 |
||
|
final
1.0
2012-10-30 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-10-05 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-09-14 |
||
|
final
4.0
2016-11-10 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2011-05-17 |
||
|
final
1.0
2012-05-01 |
||
|
final
1.0
2012-01-04 |
||
|
final
completed
|
||
One minute resolution merged data from instrumentation that was flown on the NASA WB-57 aircraft for the ACCLIP deployment. The ACCLIP flights were based out of Osan Air Base in South Korea and the flights were over the western Pacific Ocean region...
|
|
preliminary
|
|
One seconed resolution merged data from instrumentation that was flown on the NASA WB-57 aircraft for the ACCLIP deployment. The ACCLIP flights were based out of Osan Air Base in South Korea and the flights were over the western Pacific Ocean region...
|
|
preliminary
|
|
|
final
completed
|
||
|
final
1.0
2022-01-06 |
||
Access to the IMPACTS campaign data collection housed at NASA/GHRC can be found in the Data Access section below. The collection contains data from each of the IMPACTS campaigns that occurred in January and February 2020, 2022, and 2023 in the...
|
|
final
1.0
2022-12-07 |
|
|
final
1.0
2006-07-26 |
||
|
final
6.0
2018-06-20 |
||
|
final
6.0
2018-06-20 |
||
|
final
1.0
2018-10-05 |
||
|
final
1.0
2013-08-23 |