GCIP/EOP Land Characterization: EDC 1-km AVHRR Project
Summary
The data set is composed of 5-channel, 10-bit, raw AVHRR data, at 1.1-km resolution (at nadir) for every daily afternoon pass over all land and coastal zones using data from NOAA's polar-orbiting TIROS. Initially the data were to be collected continuously for 18 consecutive months beginning April 1, 1992, and continuing through September 30, 1993, subsequently the period has been extended to September 30, 1996.
Data access
- download: 1kmhomepage.html
Additional information
Homepage | |
Subscribe | Subscribe to receive email when new or updated data is available. |
Related projects | |
Spatial Type | grid |
Frequency | daily |
Language | English |
Categories | |
Platforms | |
Instruments | |
Related links |
|
Temporal coverage
Begin datetime | 1992-04-01 00:00:00 |
End datetime | 1996-09-30 23:59:59 |
Spatial coverage
Map data from IBCSO, IBCAO, and Global Topography.
Maximum (North) Latitude:
90.00,
Minimum (South) Latitude:
-90.00
Minimum (West) Longitude:
-180.00,
Maximum (East) Longitude:
180.00
Primary point of contact information
EOL Data Support <datahelp@eol.ucar.edu>
Additional contact information
- originator: U.S. Geological Survey